A Check can be added to a work instruction. These checks will be shown to the operator when going through the work instruction. Subsequently, the operator can enter the required response format.
Creating a check is similar to adding a work instruction step to a work instruction. Adding checks to a work instruction can be done in the following way:
- Navigate to the work instruction step where you would like to add a check into, and click on “Open”.
- Click the “Check” tab.
- Select one of the available checks.