It is possible in Azumuta to make certain checks compulsory while going through a work instruction. This can be useful to ensure:
- A product cannot be finished without the essential data.
- An experienced operator does not have to go through all the instruction steps and only stops at the steps that have a mandatory check.
Configuring a Mandatory Check in the Admin Interface #
You can make a check mandatory in the following way:
- Click on the type of check you want to make mandatory.
- Turn on “Required to be filled in before finishing work instruction”.
In the operator interface, a mandatory check is marked by the red asterisk next to the question mark.
How to Turn On the Fast Forward Mode as an Operator #
To ensure that only the work instruction steps with mandatory checks are shown to the operator, the operator must tap on the fast-forward mode button: